Lunar Gateway

~5 min read · Ch. 1 of 6
6 sections
  • The Lunar Gateway began as a concept called the Deep Space Habitat in 2012. NASA released this proposal to study requirements for deep space habitats under the NextSTEP program. Funding arrived in 2015 to explore these specific needs. By February 2018, studies from the International Space Station partners helped define capabilities for future habitation modules. The station received its official name on the 7th of November 2019, when NASA designated it simply as Gateway. This decision followed a period where the project was known as the Lunar Orbital Platform-Gateway or LOP-G since early 2019. The logo chosen for the station drew inspiration from the American landmark Gateway Arch located in St. Louis. Earlier concepts included a robotic spacecraft designed to retrieve a multi-ton boulder from an asteroid during the now-canceled Asteroid Redirect Mission. That mission ended, but the solar electric propulsion technology survived and found new life within the Gateway architecture.

  • Russia initially joined the effort with an informal joint statement announced on the 27th of September 2017. Director General Dmitry Rogozin later declared the program too U.S.-centric for Roscosmos participation in October 2020. Russia officially withdrew from the collaboration in January 2021. Canada contributes the Canadarm3 robotic arm through MDA Space, which previously built Canadarm2. The European Space Agency provides the I-Hab module along with Japan Aerospace Exploration Agency. ESA also delivers the ESPRIT service module containing xenon and hydrazine capacity plus communications equipment. The Mohammed Bin Rashid Space Centre builds the Crew and Science Airlock Module scheduled for launch around 2030. These international elements plan to launch after initial NASA modules reach lunar orbit. Some components will co-manifest with Artemis missions while others arrive independently. As of January 2024, four major space agencies planned active participation alongside commercial partners.

  • Maxar Technologies received a contract worth US$375 million in May 2019 to manufacture the Power and Propulsion Element. This module uses four 6 kW Busek Hall-effect thrusters and three 12 kW AEPS thrusters for total output under 50 kW. Northrop Grumman Innovation Systems won a US$935 million fabrication contract on the 9th of July 2021 for the Habitation and Logistics Outpost. HALO features a pressurized volume supporting four crew members for at least thirty days. Welding completed on this module by the 2nd of April 2024 before stress tests began. Solstar supplied Wi-Fi access for personnel within the HALO module starting in July 2022. Thales Alenia Space constructs both the ESPRIT module and I-Hab module hulls. The PPE has an expected service time of about fifteen years. HALO mass ranges between eight and nine tons depending on final internal layout configuration. Both initial modules launch together on a Falcon Heavy rocket no earlier than 2027.

  • The station deploys into a near-rectilinear halo orbit around the Moon with a period of approximately seven days. This eccentricity takes the station within 8,000 kilometers of the lunar north pole surface at closest approach. It travels as far away as 69,000 kilometers over the lunar south pole. Communications blackout with Earth remains minimal compared to other orbital options. Travel from cislunar space requires only 730 m/s delta-v to reach low polar orbits. Transit time spans half a day while orbital station-keeping needs less than 10 m/s per year. Spacecraft perform powered flybys followed by NRHO insertion burns when approaching apoapsis points. Total travel duration reaches five days with return trips taking similar durations if crews spend eleven days aboard. Crewed mission duration extends up to twenty-one days limited by Orion life support capabilities. The high-level architecture uses sophisticated executive control software developed at NASA facilities.

  • Former NASA administrator Michael D. Griffin testified that immediate return from the lunar surface is possible only every six and a half days. He argued this creates unacceptable risks for stranded crews whether on the surface or in lunar orbit. Geologist Clive Neal called the Gateway a waste of money failing to fulfill space policy goals. Doug Cooke wrote that NASA should defer Gateway construction to increase speed and probability of success. George Abbey stated building a station to orbit a natural space station makes no sense. Former astronaut Terry W. Virts claimed the project would shackle human exploration rather than enable it. Buzz Aldrin expressed strong opposition calling the idea absurd for sending crews to intermediate points. Mars Society founder Robert Zubrin labeled it NASA's worst plan yet exposing subjects to irradiation like Nazi doctors did during World War Two. Astrophysicist Ethan Siegel concluded the concept advances science in no appreciable way despite costing great amounts of money.

  • The United States Government Accountability Office released a report on the 31st of July 2024 finding numerous technical problems unaddressed by NASA. One issue involved PPE controllability when large heavier vehicles dock with the Gateway. The mass of Starship lunar landers reaches approximately eighteen times greater than values used for parameter development. Co-manifested vehicle masses exceed allocations potentially affecting ability to reach correct lunar orbits. Late design changes could result in cost growth or schedule delays. Defects on network chips affect multiple components including HALO flight computers causing unexpected restarts. President Donald Trump signed the One Big Beautiful Bill Act into law on the 4th of July 2025 allocating US$2.6 billion. This legislation requires at least US$750 million spent annually from fiscal year 2026 through 2028. A previous budget proposal from the 2nd of May 2025 had suggested canceling the program citing escalating costs. Jared Isaacman authored an internal policy blueprint titled Project Athena exploring repurposing elements for nuclear-powered tug vehicles. Neither Isaacman nor NASA have publicly endorsed this specific concept yet.

Common questions

When did the Lunar Gateway receive its official name?

The Lunar Gateway received its official name on the 7th of November 2019 when NASA designated it simply as Gateway. This decision followed a period where the project was known as the Lunar Orbital Platform-Gateway or LOP-G since early 2019.

Which countries participate in the Lunar Gateway program and what modules do they provide?

Canada contributes the Canadarm3 robotic arm through MDA Space while the European Space Agency provides the I-Hab module along with Japan Aerospace Exploration Agency. The Mohammed Bin Rashid Space Centre builds the Crew and Science Airlock Module scheduled for launch around 2030 and ESA also delivers the ESPRIT service module containing xenon and hydrazine capacity plus communications equipment.

What are the technical specifications of the Power and Propulsion Element for the Lunar Gateway?

Maxar Technologies received a contract worth US$375 million in May 2019 to manufacture the Power and Propulsion Element which uses four 6 kW Busek Hall-effect thrusters and three 12 kW AEPS thrusters for total output under 50 kW. The PPE has an expected service time of about fifteen years and both initial modules launch together on a Falcon Heavy rocket no earlier than 2027.

How does the Lunar Gateway orbit the Moon and what is its orbital period?

The station deploys into a near-rectilinear halo orbit around the Moon with a period of approximately seven days. This eccentricity takes the station within 8,000 kilometers of the lunar north pole surface at closest approach and it travels as far away as 69,000 kilometers over the lunar south pole.

Who criticized the Lunar Gateway program and what were their main arguments?

Former NASA administrator Michael D. Griffin testified that immediate return from the lunar surface is possible only every six and a half days creating unacceptable risks for stranded crews whether on the surface or in lunar orbit. Mars Society founder Robert Zubrin labeled it NASA's worst plan yet exposing subjects to irradiation like Nazi doctors did during World War Two while geologist Clive Neal called the Gateway a waste of money failing to fulfill space policy goals.

What recent government actions affected funding for the Lunar Gateway program?

President Donald Trump signed the One Big Beautiful Bill Act into law on the 4th of July 2025 allocating US$2.6 billion which requires at least US$750 million spent annually from fiscal year 2026 through 2028. A previous budget proposal from the 2nd of May 2025 had suggested canceling the program citing escalating costs before this legislation was enacted.

All sources

89 references cited across the entry

  1. 2newsA Closer Look at NextSTEP-2 Deep Space Habitat ConceptsDoug Messier — Parabolic Arc — August 11, 2016
  2. 3webDeep Space 2018 ProgramUniversities Space Research Association
  3. 8webRoundup Presents: The Directors Series (MA)Noah J. Michelsohn — NASA/JSC — 2019-12-09
  4. 10webNASA Selects Studies for Gateway Power and Propulsion ElementJimi Russell — NASA — November 2017
  5. 17webOne Big Beautiful Bill Act119th United States Congress — July 4, 2025
  6. 21webHalo orbit selected for Gateway space stationDavid Szondy — 2019-07-19
  7. 22webOptions for Staging Orbits in Cis-Lunar SpaceRyan Whitley et al. — NASA — 21 October 2015
  8. 39webAbout Canadarm3Canadian Space Agency — 2020-06-26
  9. 40webBuilding the next CanadarmCanadian Space Agency — 2020-06-26
  10. 43webGatewayEuropean Space Agency
  11. 44webGateway: Lunar LinkEuropean Space Agency
  12. 45webGateway: Lunar ViewEuropean Space Agency
  13. 46webGateway: Lunar I-HabEuropean Space Agency
  14. 47webArtemis IVEuropean Space Agency
  15. 51webReturning to the Moon: Keeping Artemis on TrackM. D. Griffin — 2024-01-17
  16. 55webGateway Space StationNASA — 2023-06-12
  17. 59webNASA Seeks Ideas for Scientific Activities Near the MoonE. Mahoney — NASA — 2018-08-24
  18. 60press releaseNASA Awards Contract to Launch Initial Elements for Lunar OutpostM. Witt et al. — NASA — 2021-02-09
  19. 61press releaseNASA, Japan Announce Gateway Contributions, Space Station ExtensionM. Etkind et al. — NASA — 2022-11-17
  20. 62press releasePresident Trump's FY26 Budget Revitalizes Human Space ExplorationJ. M. Dooren et al. — NASA — 2025-05-02
  21. 63webNASA Starts Up Gateway's Power System for First TimeB. R. Zamora — NASA — 2026-01-08
  22. 64press releaseNASA Unveils Initiatives to Achieve America's National Space PolicyL. E. Low — NASA — 2026-03-24
  23. 65webNASA's Worst Plan YetR. Zubrin — 2017-05-16
  24. 66webNASA updates Lunar Gateway PlansP. Sloss — 2018-09-11
  25. 72newsNASA closing out Asteroid Redirect MissionJeff Foust — 2017-06-14
  26. 75newsIs the Gateway the right way to the moon?Jeff Foust — 2018-12-25
  27. 78newsHouse committee raises doubts about ArtemisJeff Foust — 2019-11-14
  28. 82newsUAE to build airlock for lunar GatewayJeff Foust — 2024-01-07
  29. 90newsFunding Europe's space ambitionsJeff Foust — 2019-12-02