Hydro-Québec
Hydro-Québec's logo is a stylized letter Q, built from a circle and a lightning bolt. The Montreal design agency Gagnon/Valkus created it in 1960. By then the company already ran electricity across most of the province. Today, Hydro-Québec is one of the largest hydropower producers in the world. More than 40 percent of Canada's water resources sit inside Quebec's borders, and Hydro-Québec manages most of them. The company generates, transmits, and distributes power across the province, and sends electricity south into New England. It now supplies about 10 percent of that region's power needs. Yet Hydro-Québec began as an act of nationalization. In 1944, the Quebec government seized Montreal Light, Heat & Power and its subsidiary, Beauharnois Power, from private ownership. How did that single takeover grow into a company running 63 hydroelectric stations with a combined capacity of 37,370 megawatts? Why does its dividend to the Quebec government spark argument decade after decade? And what has building dams across the province's north cost the land, the climate ledger, and the Indigenous communities who live there?
Advocates for a public hydroelectric utility in Quebec pointed to high costs, poor rural service, and English-dominated management as reasons for change. Premier Adélard Godbout answered with a policy to spend 10 million dollars a year on rural electrification. That same year the government changed, and new premier Maurice Duplessis opposed any government role in the economy. Rural communities formed local cooperatives instead, to bring in power on their own. Duplessis stayed in office until 1960. During his rule, Hydro-Québec mainly served the Montreal area, and there were no further nationalizations.
Between 1944 and 1962, Hydro-Québec's installed capacity climbed from 616 megawatts to 3,661 megawatts. Over the same years, it cut residential rates in the Montreal area in half. Duplessis died in office in 1959, closing an era Quebecers still call the Grande Noirceur. Jean Lesage's Liberal Party then swept to power, opening what became known as the Quiet Revolution.
In 1962, the United States government lent Quebec 300 million dollars. The province used the money to buy up independent power companies. The new government also gave Hydro-Québec sole authority to develop new sites. In 1963, it authorized the company to acquire private distributors, including the Gatineau Power Company and the Shawinigan Water & Power Company. That gave Hydro-Québec reach across the entire province. All 46 rural cooperatives accepted its 1963 buyout offer, except one, Saint-Jean-Baptiste-de-Rouville, which still operates today. In 1964, British Columbia lent Quebec 100 million dollars, and 60 million of that went to Hydro-Québec, a move that stirred controversy in the legislature.
Quebec's engineers were about to turn their attention to rivers far to the north, chasing power on a scale the province had never attempted.
The Bersimis-1 generating station started producing power in 1956, at a capacity of 1,125 megawatts. Bersimis-2 followed in 1959, at 845 megawatts. The Beauharnois Hydroelectric Generating Station was completed in 1961, at 1,903 megawatts, and the Carillon Generating Station, built between 1959 and 1964, added 752 megawatts.
Next came the seven-dam Manicouagan-Outardes Project. It included the Jean-Lesage generating station, at 1,145 megawatts, the René-Lévesque generating station, at 1,244 megawatts, and the Daniel-Johnson Dam, at 2,596 megawatts. These stations were originally named Manic-2, Manic-3, and Manic-5. Because they sat roughly 700 kilometres from the cities of southern Quebec, engineer Jean-Jacques Archambault led the effort to raise transmission voltage to 735 kilovolts, the first line anywhere in the world built to run that strong.
In Labrador, the Churchill Falls Generating Station added 5,428 megawatts. Quebec negotiated a contract letting Hydro-Québec buy that power at 1969 prices all the way to 2041, a deal that became a lasting source of conflict with Newfoundland. In December 2024, Newfoundland premier Andrew Furey and Quebec premier François Legault signed a 50-year memorandum of understanding. It leaves the original contract in place but has Hydro-Québec pay a fixed amount above the 1969 price, still well below market value. If ratified, the company would pay an average of 2.7 cents per kilowatt hour for Churchill Falls power until 2075.
The first phase of the James Bay Project broke ground in this same era. Hydro-Québec also partnered with Atomic Energy of Canada Limited to build the Gentilly Nuclear Generating Station, a CANDU-design reactor that ran until it was shut down in 2012.
A downturn in the economy cut electricity demand sharply in the early 1980s, forcing structural change. Hydro-Québec became a joint stock company, with the Government of Quebec as its sole shareholder, paying an annual dividend. It also gained a mandate to export power and work in any energy-related field. In 1986, the Quebec-New England Transmission line began carrying James Bay power roughly 1,100 kilometres south to the Boston area. The second phase of the James Bay Project started in 1987 and took nine years to finish. Construction on the Denis-Perron Dam began in 1994.
All that power had to travel hundreds of kilometres before it reached a customer, over wires exposed to Quebec's harshest weather.
In 1988, an equipment failure at a substation on the North Shore knocked out power across all of Quebec and parts of New England and New Brunswick.
The March 1989 geomagnetic storm tripped circuit breakers throughout the transmission network, causing a nine-hour blackout across the province.
The North American ice storm of 1998 brought five days of freezing rain. It collapsed 600 kilometres of high-voltage lines and more than 3,000 kilometres of smaller distribution lines in southern Quebec. As many as 1.4 million customers went without power, some for as long as five weeks.
TransÉnergie, Hydro-Québec's transmission division, now operates the largest electricity transmission network in North America. Its high-voltage lines stretch over 33,630 kilometres, including 11,422 kilometres running at 765 and 735 kilovolts, linked by 514 substations. Seventeen ties connect the network to neighbouring provinces and the United States, with a maximum reception capacity of 10,850 megawatts and a maximum transmission capacity of 7,994 megawatts.
Quebec's grid runs asynchronously from its neighbours on the Eastern Interconnection. It uses the same 60 hertz frequency as the rest of North America, but not the same phase. TransÉnergie relies on back-to-back HVDC converters to trade power across that divide. That separation let Hydro-Québec stay largely unaffected by the Northeast Blackout of the 14th of August 2003, apart from five hydro plants on the Ottawa River tied directly into Ontario's grid. A new 1,250-megawatt back-to-back HVDC tie at the Outaouais substation, near the Ontario border in L'Ange-Gardien, has been running since 2009. Its 315-kilovolt line has been fully operational since 2010.
Keeping the lights on took massive investment, and where the profits from that investment should go has divided the province for decades.
In 2023, Hydro-Québec paid 2.47 billion dollars in dividends to its sole shareholder, the Government of Quebec.
That obligation traces back to 1981. That year, the Parti Québécois government issued itself 43,741,090 shares in the company, each valued at 100 Canadian dollars. The same amendment required Hydro-Québec to pay out up to 75 percent of its net earnings as dividends, reshaping the social pact the company was built on in 1944.
Economist Marcel Boyer and businessman Claude Garcia are both tied to the Montreal Economic Institute, a conservative think tank. They have long argued that private management would run the company better, and that a sale could shrink Quebec's public debt.
During the 2008 election, Mario Dumont of the Action démocratique du Québec floated selling a minority stake in the company. A Léger Marketing poll that November found 53 percent of Quebecers opposed his plan to sell 7.5 percent of the company's equity, while 38 percent favoured it.
Appearing on Guy A. Lepage's talk show, former premier Jacques Parizeau said the idea would be deeply unpopular. He noted that Quebecers see Hydro-Québec as a national success story and a source of pride. The Liberal government has repeatedly said the company is not for sale.
Yvan Allaire of Montreal's business school HEC argued for raising electricity rates instead, as a way to grow the government's dividend without selling any part of the company. Columnist Bertrand Tremblay of Saguenay's Le Quotidien took the opposite view. In his words, Quebec was once "somewhat of a banana republic, almost giving away its forestry and water resources."
Academics Léo-Paul Lauzon and Gabriel Sainte-Marie of UQAM argued that privatization would raise costs for residential customers and break the social pact between the province and its people.
Owning the company was one debate. What its dams had done to the land they flooded was another matter entirely.
Since the late 1970s, Hydro-Québec has run a network of 27 monitoring stations in the James Bay area, tracking its dams' effects on the environment.
Thirty years of that research found mercury levels in fish rise three to six times within 5 to 10 years after a reservoir floods. Levels then gradually decline back to normal within 20 to 30 years, a pattern matched by similar studies in Canada, the United States, and Finland.
Flooding does displace or kill animals that cannot migrate, turning land into water. But habitat lost to flooding is partly replaced along the exposed banks of the rivers below the dams, and reservoir islands support wildlife similar to natural ones. Migratory species such as caribou have grown so numerous that hunting quotas have been expanded.
Greenhouse gas emissions from a new reservoir rise for a few years after it floods, then settle after about a decade to levels close to nearby natural lakes. Gross emissions from reservoirs in the James Bay area run around 30,000 tonnes of carbon dioxide equivalent per terawatt-hour generated. Hydro-Québec says its hydroelectric plants release 35 times less greenhouse gas than comparable gas-fired plants, and 70 times less than coal-fired ones.
Hydroelectric development accelerated a shift toward settled life among the Innu of the North Shore and the Cree and Inuit of northern Quebec, a process that had begun in the 1950s. A Hydro-Québec report on the years from 1970 to 2000 found some Cree communities had reached a point "where they increasingly resemble the industrialized society of the South." The same report noted that unemployment and social problems grew once large construction projects wound down in the 1990s.
Public opposition helped kill the Suroît project in November 2004. Afterward, under new chief executive Thierry Vandal, the company set three conditions for any new hydroelectric project: it had to be cost effective, environmentally acceptable, and welcomed by local communities. Since 2007, Hydro-Québec has reported under the Global Reporting Initiative. It employs 250 professionals and managers in its environmental field, working under an ISO 14001-certified management system.
The Innu Nation filed a $4 billion claim against Hydro-Québec in October 2020, seeking compensation for damages caused by the Churchill Falls Generating Station.
By the end of 2010, Hydro-Québec served 4,060,195 customers, split across residential and farm, commercial and institutional, and industrial rate categories.
The average residential and farm customer used 16,857 kilowatt-hours of electricity in 2011. Electric heating drives most of that demand, supplying 77 percent of homes' space heat and 90 percent of their hot water.
Despite Quebec's cold winters, the residential sector produced just 5.5 percent of the province's greenhouse gas emissions in 2006, or 4.65 megatonnes. That figure had fallen 30 percent since 1990.
Because so many homes rely on electric heat, demand swings sharply with the weather, and Hydro-Québec's system peaks in winter rather than summer. A new all-time record was set on the 23rd of January 2013, with a load of 38,910 megawatts. It surpassed earlier records of 37,717 megawatts in 2011-37,230 megawatts in 2009, and 36,268 megawatts in 2004.
Residential rates carry a daily subscription fee of 40.64 cents, plus tiered pricing. As of the 1st of April 2012, customers paid 5.32 cents per kilowatt-hour for the first 30 daily kilowatt-hours, and 7.51 cents beyond that. The average residential bill ran about 100 Canadian dollars a month in 2008. A five-year rate freeze between May 1998 and January 2004 gave way to eight separate increases through 2010, totalling 18.4 percent. Rollbacks of 0.4 percent in 2011 and 0.5 percent in 2012 followed.
In 2007, Hydro-Québec pulled out of a federal smart meter initiative, saying it would be "too costly to deliver real savings." A two-year pilot with 2,000 customers in four cities followed. A 2010 report found only minimal savings from time-of-use pricing, though the company still planned to phase in advanced metering between 2011 and 2017.
Industrial customers bought 68.4 terawatt-hours of power in 2010-40.4 percent of everything Hydro-Québec sold domestically. Since 1974, the province has reserved the right to allocate large blocks of power to companies case by case. That allocation threshold fell from 175 megawatts to 50 megawatts under a 2006-2015 energy strategy. In 2010, the largest industrial users paid an average of 4.66 cents per kilowatt-hour, while companies with special contracts paid 3.07 cents.
In 1987, Hydro-Québec struck risk-sharing power deals with aluminum producers Alcan and Alcoa, pricing electricity partly on world aluminum prices and the Canadian dollar. On the 10th of May 2007, the province renewed Alcan's water rights on the Saguenay and Peribonka rivers, in exchange for continued investment and jobs in Quebec, a deal that survived Alcan's later merger with Rio Tinto. On the 19th of December 2008, Hydro-Québec signed a similar agreement with Alcoa, running until 2040. It covers three smelters, in Baie-Comeau, Bécancour, and Deschambault-Grondines, and lets Alcoa expand its Baie-Comeau plant by 110,000 tonnes a year, to a total of 548,000 tonnes.
Economists Jean-Thomas Bernard and Gérard Bélanger of Université Laval estimated in 2008 that each job tied to a new aluminum smelter costs the province between 255,357 and 729,653 Canadian dollars a year, once lost export revenue is counted. Luc Boulanger, who heads the association representing Quebec's large industrial customers, disputed that math: "We find that the more we export, the less lucrative it gets."
In 2018, after China cracked down on cryptocurrency mining, Bitcoin miners began flocking to Quebec, drawn by a provincial energy surplus equal to 10 terawatt-hours a year.
In 2017, Hydro-Québec earned net export revenue of 1,651 million dollars from 34.4 terawatt-hours of electricity, sold mostly to New England, 53 percent, New York, 23 percent, and Ontario, 13 percent.
Most export sales are short-term deals, but the company has signed long-term contracts too. In 1990, it agreed to a 328-megawatt deal with 13 electric distributors in Vermont. On the 11th of March 2010, Vermont's two largest utilities, Green Mountain Power and Central Vermont Public Service, signed a tentative 26-year deal to buy up to 225 megawatts of hydro power from 2012 through 2038. The deal depended on large hydro being legally classified as renewable energy.
With Ontario, Hydro-Québec signed a 500-megawatt seasonal capacity-sharing deal in 2015, since Ontario's demand peaks in winter while Quebec's peaks in summer. A follow-up long-term agreement, signed in 2016 and running from 2017 to 2023, sends 2 terawatt-hours a year to Ontario, in exchange for backup capacity during Quebec's winter peaks.
Hydro-Québec's ventures outside Quebec began in 1978, when it created the subsidiary Hydro-Québec International to sell its expertise abroad. Over the following 25 years, it invested in Transelec in Chile, the Cross Sound Cable in the United States, Consorcio Transmantaro in Peru, Hidroelectrica Rio Lajas in Costa Rica, Murraylink in Australia, and the Fortuna generating station in Panama.
In 1999, it briefly held a 17 percent stake in SENELEC, Senegal's electric utility, when the Senegalese government sold part of the company to a consortium led by the French firm Elyo. That sale was cancelled in 2000, after Abdoulaye Wade won Senegal's presidential election.
The same year, Hydro-Québec International bought a 20 percent stake in China's Meiya Power Company for 83 million Canadian dollars, holding it until July 2004. Its staff also trained Chinese engineers in management, finance, and dam-building at projects including the Three Gorges Dam. Between 2003 and 2006, the company sold off all of its foreign investments at a profit, sending the proceeds to Quebec's Generations Fund, a trust set up to pay down public debt. In 2022, through its subsidiary HQI US Holding, Hydro-Québec bought Great River Hydro for 2.2 billion US dollars.
Alongside its dealmaking, Hydro-Québec has invested in research for more than 40 years. Engineer Lionel Boulet founded its research institute, IREQ, in 1967, in Varennes, on Montreal's South Shore, giving Hydro-Québec the only large research institute run by a utility in North America. It operates on an annual budget of roughly 100 million Canadian dollars, focused on high voltage systems, mechanics, and network simulation.
In 1994, IREQ engineer and physicist Pierre Couture built the first prototype of an electric wheel motor that caught public attention in Quebec. A 1998 spinoff, TM4 Electrodynamic Systems, later carried the idea forward, partnering with France's Dassault and Heuliez to build prototype electric cars called the Cleanova in 2006. In early 2009, at the Montreal International Auto Show, Hydro-Québec announced that Tata Motors had chosen its engine for a demonstration version of the Indica, to be road-tested in Norway.
In April 2011, the Quebec government set a target for a quarter of new cars sold in 2020 to be electric, and asked Hydro-Québec to build public charging infrastructure. The first 30 stations of what became the Electric Circuit network opened in March 2012, and its first 400-volt fast charger followed in 2013. By 2023, the network offered nearly 3,500 public charging stations across Quebec and eastern Ontario.
Recent research by Gazar and colleagues, published in 2024, modelled how cross-border transmission links, new hydroelectric capacity, and energy demand in the northeastern United States and Canada relate to each other, using a Bayesian network analysis. Their work found that growth in Quebec's hydroelectric capacity has tracked domestic demand and market prices more closely than the size of transmission corridors heading south, a finding likely to shape whether future US-Canada intertie projects must weigh new reservoir development in their environmental reviews.
Common questions
Where is Hydro-Québec headquartered?
Hydro-Québec is headquartered in Montreal, Quebec. It is a Canadian Crown corporation that manages the generation, transmission and distribution of electricity across the province.
When was Hydro-Québec founded?
Hydro-Québec was established in 1944 as a Crown corporation of the government of Quebec. It was created through the expropriation of private power firms, including Montreal Light, Heat & Power and its subsidiary, Beauharnois Power.
How much electricity does Hydro-Québec generate?
Hydro-Québec operates 63 hydroelectric power stations with a combined output capacity of 37,370 megawatts. More than 40 percent of Canada's water resources are located in Quebec.
How much did Hydro-Québec pay in dividends in 2023?
Hydro-Québec paid 2.47 billion dollars in dividends in 2023 to its sole shareholder, the Government of Quebec. Under a 1981 amendment, the company can pay out up to 75 percent of its net earnings as dividends.
What caused the major power outages in Hydro-Québec's history?
In 1988, an equipment failure at a North Shore substation cut power across Quebec and parts of New England and New Brunswick. The March 1989 geomagnetic storm caused a nine-hour blackout, and the 1998 ice storm left up to 1.4 million customers without power for as long as five weeks.
Who designed the Hydro-Québec logo?
The Montreal design agency Gagnon/Valkus designed the Hydro-Québec logo in 1960. It is a stylized letter Q formed from a circle and a lightning bolt.
All sources
122 references cited across the entry
- 1Annual Report 2025Hydro-Québec
- 5Adélard GodboutDaniel Latouche
- 7BookLes enjeux économiques de la nationalisation de l'électricité (1962–1963)Carol Jobin — Éditions coopératives Albert Saint-Martin — 1978
- 8BookHydro-Québec: autres temps, autres défisRobert Boyd — Presses de l'Université du Québec — 1995
- 9NewsEnthusiastic Lesage says BC loan is good for businessThe Canadian Press — 1964
- 11JournalIEEE Milestone: 40th Anniversary of 735 kV Transmission SystemVijay K. Sood — Spring 2006
- 14NewsSpeaking notes from an address by Brian TobinGovernment of Newfoundland and Labrador — November 19, 1996
- 15NewsAfter fanfare of Churchill Falls deal, Newfoundland urged to learn its dam lessonsSarah Smellie — December 17, 2024
- 20NewsAnnual Report 2017Hydro-Quebec — Hydro-Quebec — 14 November 2001
- 21An Act respecting the Régie de l'énergie, R.S.Q. c. R-6.01National Assembly of Quebec
- 22Respect du critère de fiabilité en puissance - bilan du Distributeur pour l'année 2008-2009Hydro-Québec Distribution — Régie de l'énergie du Québec — 16 December 2008
- 23NewsDécret 1277-2001 du 24 octobre 2001 concernant les caractéristiques de l'approvisionnement des marchés québécois en électricité patrimonialeGovernment of Quebec — Government of Quebec — 14 November 2001
- 24Privatising Hydro-Québec: An idea worth exploringMarcel Boyer et al. — Montreal Economic Institute — August 2007
- 25NewsFaut-il privatiser Hydro ?Radio-Canada — 8 November 2008
- 26Léger Marketing / Journal de Montréal / TVA / The Gazette Poll- Analysis ReportLéger Marketing — 10 November 2008
- 27Tout le monde en parle (interview)Guy A. Lepage — Radio-Canada — 16 November 2008
- 28NewsPrivatisation d'Hydro: " pas dans les cartons du gouvernement "Denis Lessard — 4 February 2009
- 29NewsVive l'électricité plus chère !Pierre Fortin — 15 September 2008
- 30Le marché québécois de l'électricité: à la croisée des cheminsJean-Thomas Bernard — Université Laval — April 2005
- 31NewsPrivatiser Hydro-Québec ?Yvan Allaire — 10 September 2007
- 32NewsNon à la privatisationBertrand Tremblay — 10 March 2009
- 33Continuer à privatiser Hydro-Québec, ou consolider ses opérationsLéo Paul Lauzon — 1994
- 34NewsVendre Hydro ne règle rienGabriel Sainte-Marie — 27 February 2009
- 35Hydro-Québec's electricity facts: Energy Supplies and Air EmissionsHydro-Qubébec — 2014
- 36Discover our Hydroelectric FacilitiesHydro-Québec
- 37NewsQuebec nuclear reactor shutdown will cost $1.8 billionCBC News — 3 October 2012
- 38NewsSorel-Tracy: Hydro-Québec ferme la centrale thermiqueLouise Grégoire-Racicot — November 4, 2011
- 40BookAnnual Report 2023Hydro-Québec
- 41NewsTransÉnergie: Playing Two Power GamesPeter Fairley — April 2005
- 42Discover Hydro-Québec TransÉnergie and its system - ProfileHydro-Québec TransÉnergie
- 43NewsNouvelle entente avec Hydro-Québec - Terre-Neuve vendra son électricité directement aux AméricainsRobert Dutrisac — 3 April 2009
- 44NewsFragile entente avec Terre-Neuve sur Churchill FallsDenis Lessard — 3 April 2009
- 45Reliability Functional Model for North AmericaReliability Coordinator for Québec — Hydro-Québec TransÉnergie
- 47315/230-kV Outaouais Substation - Start of WorkHydro-Québec — June 2007
- 48BookFinal Report on the August 14, 2003 Blackout in the United States and Canada : Causes and RecommendationsU.S.-Canada Power System Outage Task Force — April 2004
- 49Discover Hydro-Québec TransÉnergie and its system - Features of Our Transmission SystemHydro-Québec TransÉnergie
- 50Route InformationNorthern Pass Transmission — Northern Pass Transmission LLC — 2010
- 51NewsNew Transmission Line Reaches MilestoneJohn Dillon — 8 October 2010
- 52NewsNStar to build hydro power lineKyle Alspach — 5 October 2010
- 53NewsEnergy project unveiled; impact called 'staggering'Kenny Constant — 13 October 2010
- 54NewsU.S. calls power line a landmark investmentRebecca Penty — 14 November 2009
- 55Membres de l'AREQAssociation des redistributeurs d'électricité du Québec
- 56Book2007 Annual Report : Green EnergyHydro-Québec — April 2008
- 57Electricity Supply Contracts by TechnologyHydro-Québec Distribution
- 58Québec veut que le quart des autos vendues en 2020 soient électriquesAnnie Morin — 2011-04-07
- 59Voitures électriques - Hydro jette les bases d'un réseau de bornes de rechargeLouis-Gille Francoeur — 2011-06-17
- 61Circuit électrique: inauguration des premières bornesAndré-Anne Cadieux — 2012-04-12
- 62Première borne de recharge rapide entre Montréal et QuébecPaul-Robert Raymond — 2014-09-29
- 63NewsL'IREQ: leader de l'innovation technologique à Hydro-QuébecJohanne Gauthier — October 2007
- 64Hydro-Québec Research InstituteHydro-Québec Technologie
- 65Our Innovation AvenuesHydro-Québec Technologie
- 66NewsHydro-Québec and its partners in research and developmentDanielle Ouellet et al. — Winter 1993–1994
- 67Energy Technology Laboratory (LTE)Hydro-Québec Technologie
- 68NewsMoteur électrique: percée majeure chez Hydro-QuébecSébastien Templier — 16 October 2009
- 69NewsUne batterie dans les cartons d'Hydro-QuébecFrançois Cardinal — 19 November 2008
- 70Pourrait-on construire une voiture électrique au Québec?Pierre Lavallée — Radio-Canada — 15 April 2003
- 71NewsVolvo sur les traces d'HydroLouis-Gilles Francoeur — 15 January 2008
- 72La Voiture électrique d'HydroGilles Provost et al. — Radio-Canada — 9 March 1997
- 73HistoryTM4 Electrodynamic Systems
- 74Voiture électrique: Moteur québécois, fabrication étrangère ?Radio-Canada — 22 September 2006
- 75TM4 partners with Tata Motors and Miljø in electric vehicle demonstration projectHydro-Québec — 15 January 2009
- 76NewsHydro-Québec est en voitureLouis-Gilles Francoeur — 16 January 2009
- 77NewsThe Romaine Hydroelectric Complex - Premier Charest launches largest construction project in CanadaHydro-Québec — CNW Group — 13 May 2009
- 78NewsUne autre rivière à harnacher dans la mire de Jean CharestLouis-Gilles Francoeur — 11 March 2009
- 79Press releaseTranselec Chile: Hydro-Québec sells its stake for C$1.7 billionHydro-Québec — 16 June 2006
- 80Enel acquires joint stake in FortunaBusiness News America — 4 August 2006
- 81BookAnnual Report 1999 : All our energy for youHydro-Québec — Hydro-Québec — 2000
- 82HistoireSociété nationale d'électricité du Sénégal
- 83Hydro-Québec International Sells its Stake in Meiya Power Company Limited of China for US$84.6 MillionHydro-Québec — 30 July 2004
- 84NewsIl y a un peu d'Hydro-Québec dans le barrage des Trois GorgesPresse canadienne — 19 May 2006
- 85NewsUn milliard au Fonds des générationsRobert Dutrisac — 24 October 2006
- 878- Fish CommunitiesHydro-Québec — Hydro-Québec — 2003
- 88The Issue of Mercury for Hydro-QuébecHydro-Québec
- 89Greenhouse Gas Emissions and Hydroelectric ReservoirsHydro-Québec
- 90Comparing Power Generation OptionsLuc Gagnon — Hydro-Québec — January 2003
- 93BookSustainability Report 2007: Sustainable EnergyHydro-Québec — 2008
- 95Press releaseFitch Rates Hydro-Quebec's US$3B Medium-Term Note Program 'AA-'; Outlook StableFitch Ratings — 31 January 2012
- 96BookStrategic Plan 2004-2008Hydro-Québec — Hydro-Québec — 2003
- 97NewsPas de hausse de tarifs pour Hydro l'an prochainOlivier Bourque — 3 August 2010
- 98NewsHydro-Québec ordered to roll back its ratesLynn Moore — 9 March 2012
- 99Factors that Influence your ConsumptionHydro-Québec — Hydro-Québec
- 100Inventaire québécois des émissions de gaz à effet de serre en 2006 et évolution depuis 1990Government of Quebec — Quebec Department of Sustainable Development, Environment and Parks — November 2008
- 101NewsQuebec hits all-time high for power consumption during cold snapCBC News — January 23, 2013
- 102NewsVague de froid: Hydro prévoit une pointe de consommation historique23 January 2011
- 103NewsFroid sibérien - Le réseau d'Hydro poussé à son extrême limiteMarco Bélair-Cirino — 16 January 2009
- 104Regular billHydro-Québec
- 105Rate D – Domestic rate (residential and farms)Hydro-Québec — April 2012
- 107Equalized Payments Plan and Authorized PaymentHydro-Québec Distribution
- 108NewsHydro Quebec shelves smart metersCBC News — 10 December 2007
- 109HQD-12, Document 6 – Rapport final du Projet Tarifaire Heure JusteHydro-Québec Distribution — Régie de l'énergie du Québec — 2 August 2010
- 110NewsElectric Light & Power 2010 Utility of the Year: Hydro-QuebecKristen Wright — December 2010
- 111BookAvis de la Régie de l'énergie sur la distribution d'électricité aux grands consommateurs industriels (A-2005-01)Régie de l'énergie du Québec — 30 May 2005
- 112Rapport annuel 2010: HQD-10, document 2 - Historique des ventes, des produits des ventes, des abonnements et de la consommationHydro-Québec Distribution — May 20, 2011
- 113NewsLes alumineries coûtent cher à Hydro-Québec: plus de 3 milliards $Pierre Couture — 28 August 2008
- 114Le projet d'acquisition d'Alcan par Rio Tinto respecte les accords qui lient Alcan et le gouvernement du QuébecGouvernement du Québec — Quebec Department of Economic Development, Innovation and Exports — 7 August 2007
- 115NewsAlcoa et Hydro-Québec ont renouvelé des ententes jusqu'en 2040Presse canadienne — 20 December 2008
- 116NewsChinese bitcoin miners eye sites in energy-rich CanadaAllison Lampert — 12 January 2018
- 118Press releaseHydro-Québec: North America's leading provider of clean energyHydro-Québec — 2018-10-14
- 119Press releaseGovernor, Premier announce preliminary Vermont-Hydro-Québec agreementHydro-Québec — 11 March 2010
- 120Press releaseExchange with OntarioHydro-Québec — 2018-10-14
- 123JournalCausal inference to scope environmental impact assessment of renewable energy projects and test competing mental models of decarbonizationAmir M. Gazar et al. — 2024