Questions about Kennedy Space Center Launch Complex 39
Short answers, pulled from the story.
When did the Navy transfer the Banana River Naval Air Station to the Air Force for V-2 rocket testing?
The Navy transferred the former Banana River Naval Air Station to the Air Force in 1948. This site on the East Florida coast offered launches over the ocean away from populated areas.
What were the dimensions and weight of the Mobile Launcher used with Saturn V rockets at Kennedy Space Center Launch Complex 39?
Each Mobile Launcher weighed 6 million pounds and stood 40 feet tall. The umbilical tower contained nine retractable swing arms extending to provide access for people wiring and plumbing.
On what date did SpaceX sign a 20-year lease for Pad 39A at Kennedy Space Center Launch Complex 39?
SpaceX signed the 20-year lease modifying the pad for Falcon 9 and Falcon Heavy launches on the 14th of April 2014. Modifications included constructing Horizontal Integration Facilities similar to Cape Canaveral facilities.
When did the Space Launch System launch from Complex 39B as part of the Artemis I mission?
The Space Launch System launched from Complex 39B on the 16th of November 2022 at 06:47:44 UTC. This marked return of human spaceflight to the Moon after decades.
Who cut the ribbon for the completion of Pad 39C construction at Kennedy Space Center Launch Complex 39?
Kennedy Space Center director Robert D. Cabana cut the ribbon on the 17th of July 2015 marking completion. The concrete pad measured 60 feet wide by 100 feet long supporting combined weights up to 1 million pounds.